Linda
The set cladding was finished onsite during night-shifts demonstrating the high end finish Scott Fleary can achieve even under considerable pressure.
Project Details
Designer: Es Devlin
Client: Royal Court Theatre
Location: Royal Court Theatre
This three-story house that was conceived to be as transparent as possible, able to revolve in a pool of water. The design was only finalised 10 days before it was due on stage meaning the complicated construction that included cantilevered floors, had to be built in a very limited time scale.