Linda

The set cladding was finished onsite during night-shifts demonstrating the high end finish Scott Fleary can achieve even under considerable pressure.

Project Details

Designer: Es Devlin

Client: Royal Court Theatre

Location: Royal Court Theatre

This three-story house that was conceived to be as transparent as possible, able to revolve in a pool of water. The design was only finalised 10 days before it was due on stage meaning the complicated construction that included cantilevered floors, had to be built in a very limited time scale.

Related Projects

Dying for It

1

Dying for It

The Guardian described it as, ‘Atmospherically set by Lez Brotherston around a spiralling stairwell that is a grubby.

Dying for It Read More
Frankenstein

2

Frankenstein

Scott Fleary were approached by the National Theatre to construct parts of the set for the new production.

Frankenstein Read More
Treasure Island

3

Treasure Island

The Guardian, who thought the production was ‘Astonishing’, described Lizzie Clachan’s set design as, ‘A drama of its.

Treasure Island Read More